Met with Roger Jarrett of DVPE to go over progress:
1. DD package was delivered on time as a single line drawing
2. Discussed band practice room and possible ventilation ideas
3. Roger indicated pool heater issue has been settled. The existing pool heater will remain as a backup
4. They will specify Titus and Price as vav box suppliers
5. The new connecting corridor will be conditioned with a blower coil
6. VAV air handler for band area will be in new second floor equipment room
7. There will be an outdoor air intake louver adjacent to the main entrance in the new addition.
8. Drawings will be completed by end of May on schedule.